Saturday, May 31, 2008

Speed Bumb

Friday was a surprise! Dan called the roofer, Able Roofing, to see if we could start the new roof and windows sooner. The roofer said he decided not to do our roof, because it was too challenging.
He reminded them Able already had half down as a deposit. I hope they don't make us come down there.

Kitchen Deconstructed



Things are going well. All the panneling is off and Jess Howard is running the new electric.

Wednesday, May 21, 2008

We own it!


We closed a couple of days ago and have started demolition.

Thursday, May 8, 2008

324 E. Welch

They accepted our offer! The closing is to be on or before May 20th and then the real fun begins.

Thursday, May 1, 2008

324 Welch Front


This is a 3 bedroom, 1 bath house with a 2 car garage.
The roof looks like it's in great shape and the garage is nice. The windows are mostly original and the storm doors need fixing.
The properties all around this house are in great shape.

Garage Door


The garage looks great, but someone hit the door from the inside.

Living Room


Kitchen


Dinning Room



Bedroom 2


Bedroom 1 Other View


This is the other side of the master

Bedroom 1


Bathroom


Furnace



The furnace was hacked up to get anything they could sell for scrap.

Basement


A small water issue. All the copper is gone.

Back yard


Back of house


Upstairs Sunroom


This is the upstairs sunroom off of the small 3rd bedroom.